Scope : Conceptual and Detailed Design
Coordinator : Javier Manterola Armisen
Project Manager : António Martínez Cutillas
End Year Construction : 2011
Typology : Arch bridges
Team : Javier Manterola Armisén, Antonio Martínez Cutillas, J.Antonio Navarro González Valerio, Silvia Fuente García, Borja Martín Martínez
GeopositionView Project

The bridge is located between the km points 210+429.375 and 211+016.625 and its overall length amounts to 587.25 m. This is a reinforced concrete arch bridge with an upper prestressed concrete deck and two approach viaducts.