Scope : Conceptual and Detailed Design
Coordinator : Javier Manterola Armisen
Project Manager : António Martínez Cutillas
Team : Javier Manterola Armisén, Antonio Martínez Cutillas, Silvia Fuente García, Miguel Ángel Gil Ginés, Borja Martín Martínez
GeopositionView Project

The Basarab Viaduct spanning the railway tracks at the Bucharest Railway Station contains a motorway, a tramline and an inter-modal interchange railway-tramline station.

The bridge is cable-stayed to a single tower. The span distribution is 56.5+75+168+36+30 m. The 7.50 m wide access ramps hang from the main span crossing the track bed. The ramps then continue, turning into prestressed concrete, small-spanned accesses. The bridge has a variable width ranging from 37.88 m to 43.38 m.