Constructing the final sections of the deck on the Bridge over the River Tajo at the Alcántara dam.

 The deck is currently being launched on the arch. In order to do so, two twin formworks advance from the north and south spans. Once the formworks reach the first pylons, concreting takes place on both sides at the same time, in order to reduce differential deformations. This...
By :
Comments : Off