The construction of the River Barrow Bridge is advancing quickly.

The construction of the River Barrow Bridge is advancing quickly. Presently 7 out 19 cables have been stressed at the central pylon and 3 out of 9 cables have been stressed at the lateral pylons. The cantilevers are about 64 m long from the central pylon and 41 m long from the...
By :
Comments : Off