Scope : Conceptual, Detailed Design and Technical asistance during Construction
Coordinator : Javier Manterola Armisen
Project Manager : Amando L.P
End Year Construction : 1983
Typology : Cable-stayed bridges
Material : Concrete
Team : Javier Manterola Armisén, Miguel Ángel Astiz Suárez, Amando López Padilla
GeopositionView Project

The absolute world record in spans until 1986 (The previous World Record went to the St. Nazaire bridge, a combined bridge L=404 m). The World Record for spans in concrete cable stayed bridges until 1995 (The previous World Record went to Brottone L=320 m).