Scope : Proyecto
Coordinator : Javier Manterola Armisén
Project Manager : Miguel Ángel Gil Gines
End Year Construction : 2015
Typology : Arch bridge
Material : Metalic
GeopositionView Project

The bridge over the Vinalopó is an upper arch with the deck divided into two exempt lanes, one on each side of the arch, which have curved plan and join to each other and with the arch at the abutments.

The arch has 120 meters of span and is 16 meters above the road. The whole structure is metallic, the arch as well as the deck.