Scope : Conceptual and Detailed Design
Coordinator : Javier Manterola Armisen
Project Manager : Miguel Ángel Gil
Construction : UTE Gorostiza (Sacyr, Exbasa)
End Year Construction : 2011
Typology : Steel and Composite Bridges
GeopositionView Project

This is a complex link-up carried out over the Cadagua River of two motorways and two railway.

The junction is comprised of three large bridges, two of which are split in two to accommodate the intersections, whereas a third bridge has a large curvature and a great width.