Scope : Conceptual and Detailed Design
Coordinator : Javier Manterola Armisén
Project Manager : Miguel Ángel Gil
End Year Construction : 2009
Typology : Steel and Composite Bridges
Team : Javier Manterola Armisén, Miguel Ángel Gil Ginés
GeopositionView Project

The Southern Metropolitan Bilbao Bypass crosses the Gorostiza Reservoir at a narrow stretch by way of two tunnels on either end. On the southern side two carriageways are joined together with the purpose of diminishing a steep scar that exits halfway up the slope. The bridges, one per carriageway, are enshrined in a natural setting of great beauty.