Scope : Conceptual and Detailed Design
Coordinator : Leonardo Fernández Troyano
Property : Xunta de Galicia
Construction : UTE Ferrovial S.A. Castro Matelo S.A.
End Year Construction : 1995
Typology : Cable-stayed bridges
Team : Leonardo Fernández Troyano, José Cuervo Fernández, Agustín Sevilla Bayal
GeopositionView Project

The bridge is crossed in a place where the shape of the river bed and the streets located at the river banks mean that the bridge would have to be made with a single span of 125 meters, without much height over the water level. A similar structure to that of the Sancho el Mayor bridge was adopted with this idea in mind, but with a different expression.